Contact Us  (800) 448-4115  

Connect With Us

Class-Size Manipulative Resource Level 1 Set

CPX-009
$200.99
CONSTRUCTIVE PLAYTHINGS EXCLUSIVE!
  • 365 pc. set
  • Ages 3 yrs +

Availability: Out of stock

  • DESCRIPTION
  • REVIEWS
  • Enough for a full class, this set includes 4 Sets of Manipulatives in Storage Tubs. Set includes, Preschool Building Bricks (ATC-05), Star Builders (CPX-836), Popping Pals (CPX-808), and Waffle Shape Blocks (CPX-809).

    Constructive Playthings Exclusive!